Servers are becoming more powerful and efficient with the evolution of
data center technology. As a result, efficiencies create many
opportunities for data center to reduce energy costs and the overall
carbon footprint. There has been a lot of buzz about blade server
systems and how they allow several servers to be managed centrally in
one rack without the need for individual networking infrastructure and
power sources. This consolidation presents a new challenge as the server
chassis becoming much heavier and more difficult to handle. So what is
the best method to safely and efficiently move heavier servers in the
data center?
Servers and other rack-mounted equipment are traditionally handled
using manual labour. Server racks can typically hold between 10 – 40
pieces of rack-mounted equipment, which can weigh between 50 and 500+
pounds. It becomes a difficult and unsafe task to manually move and lift
rack-mounted equipment within a data center environment.
It is important to select a specialised server lifting system for
your situation to ensure proper safety and efficiently. Some things to
think about:
• How heavy is your equipment?
• How many people are currently involved in the process?
• Is it important to accurately align equipment?
• What is the height of your racks?
• How narrow are your data center aisles?
Injury Statistics Show Risk
Even the most skilled and highly trained workers are at risk of
serious injury when manually moving heavy servers and data centre
equipment. It is imperative to invest the proper time, money and
resources in ensure safe data center practices and reduce the risk of
workplace injuries. The U. S. Bureau of Labor Statistics study titled Nonfatal Occupational Injuries and Illnesses Requiring Days Away from Work 2009 reported:
- 37% total injury cases requiring days away from work were back-related
- 42% of sprains, strains, and tears were the result of overexertion
- In 2009, back injuries were 60% of total workplace injuries requiring time away from work
In one case, a federal contractor sued IBM for $1.4 million when a server was damaged after falling off a forklift while being moved.
An important consideration when handling server and other
rack-mounted equipment is to use a specialised lift designed
specifically for a data center environment. It may be the smart
investment that can insure your most important data center assets – both
the team and the equipment.
For more information on the SL500 Server Lift - click here.